• Conveyor Assembly Line for Refrigerators
  • Conveyor Assembly Line for Refrigerators
  • Conveyor Assembly Line for Refrigerators
  • Conveyor Assembly Line for Refrigerators
  • Conveyor Assembly Line for Refrigerators
  • Conveyor Assembly Line for Refrigerators

Conveyor Assembly Line for Refrigerators

Automation: Half-Automation
After-sales Service: 1 Year From Bl Date
Warranty: 1 Year From Bl Date
Transmission Type: Flexible
Automatic Production Line: Assembly
Certification: ISO
Customization:
Gold Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
Customized
Flexible Production
Agile Manufacturing
Rhythm
Flow Production Line
Production Scope
Assembly and Conveyor
Transport Package
Wooden Package by Export Standard
Trademark
KCM
Origin
Chuzhou, Anhui, China
HS Code
8428909090
Production Capacity
50set /Per Year

Product Description

Refrigerator Assembly Line

  
Function:
  1. Joint inner liner with side panel and other components that is inclusive of condenser, evaporator, wire harness, back panel and so on.
  2. Make preparation for Cabinet PU Foaming afterward.

   Composition:
  1. Slat Conveyor
  2. Roller Conveyor
  3. Lifting and Rotation Device
  4. Belt Conveyor
  5. Elevator
  6. Cross Device
  7. 180°& 90° Turning Device
  8. Package Machine
  9. CPT Testing
  10. Vacuum Pump Loop Line

   Procedures:
  1. Heat pressing with adhesive tape to joint between inner liner and evaporator;
  2. Assemble the full cabinet before the operation of cabinet foaming, by using U-shell side panel or single side panel, inner liner, back panel, compressor baffle and reinforcement bar, etc.
  3. After pre-assembly and pre-heating, it's ready for Cabinet Foaming. When finishing Cabinet PU Foaming, the shape will be molded and come out with horizontal level. Some works such as PU scraps cleaning, assemble compressor base plate and other parts will be done for its vertical standing in next.
  4. Before the refrigerator is sent to CPT Testing Room, some final assembly works that inclusive of Vacuuming Pump Loop Line, Charging and Sealing, Leakage Testing, Safety Electrical Testing are willing to be completed when Fridges are stood up and buffered.
  5. CPT (Cooling Performance Testing) and Final package line:
CPT System:
The operated time per cycle: 90 mins in normal (120 mins is limited)
Final package line:
Making packages with Packing machine, Wrapping with Plastic Bags and Final Checking process, etc.


Conveyor Assembly Line for RefrigeratorsConveyor Assembly Line for RefrigeratorsConveyor Assembly Line for RefrigeratorsConveyor Assembly Line for RefrigeratorsConveyor Assembly Line for Refrigerators

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now